- Dismounting and clearance measuring of propeler shafts = 2pcs
- Dismounting, checking and measuring of propellers = 2pcs
- Check up the steering system (bushes and joints); dismounting and measurements
- Repairing pores and fissures to the hull and rudders, adding by welding pieces from steel plate
- Checking of lifiting crane 1.5to:rollers and cables; test of static resistance
- Blasting Sa2 outside shell (flat bottom, vertical sides up to strack)
- Painting outside hull with epoxi anticorrosive paint 2 layers
- Dismounting, repairing PS propeler, mounting back